Property managers & boards · New York City
EIFS facade projects for NYC property managers, co-ops and condos
Clear line-item scopes, photo documentation of opened walls, proper insurance certificates, and quiet coordination around residents and ground-floor commercial tenants.
Updated November 2026
Clear scopes that boards can compare and phase
Co-op boards, condo boards and managing agents rarely want a vague lump-sum proposal that bundles urgent leaks and optional cosmetic work into a single number. When we look at an apartment or mixed-use EIFS building in Manhattan, Brooklyn or Queens, we organize our written proposal by elevation or vertical drop so decision-makers can see what stops water immediately and what can wait for the next budget cycle.
A typical phased plan tackles active water entry first—wet window aprons, missing kick-out diverters at setbacks, open parapet transitions and split window or PTAC sealant—and groups full-elevation EIFS recoating by exposure so you never rig the same courtyard or street drop twice for overlapping work. Every exploratory probe or cutout is backed by date-stamped close-up photos showing what we found behind the lamina before new foam, mesh and base coat go back on.
Executing architect- and engineer-specified repairs
Many mid-rise and taller New York City properties bring us in after their own registered architect or professional engineer has surveyed the exterior and drawn up repair details. We are a repair contractor, not a licensed Qualified Exterior Wall Inspector (QEWI), engineer or home inspector, and we never perform FISP / Local Law 11 inspections or filings. Our role is carrying out the specified EIFS facade repairs, flashing upgrades, sealant joints and architectural coatings cleanly, submitting product data sheets and color drawdowns for approval before work begins, and keeping photo logs for the design professional's sign-off.
Insurance, submittals and building logistics
- Certificates of insurance: The Dom Construction Group LLC carries general liability, umbrella and workers' compensation insurance. Certificates are issued upon request and name the building owner, cooperative corporation or condominium board, and managing agent where required by contract.
- Direct crews, no brokered labor: Our own field team performs the EIFS, sealant and coating work, traveling down from our Albany base for scheduled city mobilizations.
- Access and permits: Our crew sets its own pipe scaffold on courtyards, setbacks and low walls, and works from rented or owner-furnished boom lifts and suspended swing stages. Sidewalk protection, DOB permits and licensed rigging setups are coordinated alongside the owner's team, expediter and design professional.
Keeping disruptions down for residents and retail tenants
Working on an occupied building means treating resident routines and ground-floor storefronts seriously. Before starting each vertical stack, we coordinate drop schedules with the superintendent so residents get clear advance notice to close windows and draw blinds. Glass and frames are masked only on active work areas and stripped promptly once coats cure. Noisy cutting stays strictly inside permitted weekday hours, entrances and fire exits remain unobstructed, and tools, masking tape and debris are cleared off sidewalks, terraces and courtyards at the close of every shift.
How a multi-unit EIFS job moves from board review to closeout
Initial review of photos or engineer notes
Send facade photos or an architect's repair schedule for a quick read on scope, seasonal weather limits and access approach.
Site walk with super, manager or engineer
Inspect courtyard, setback and street elevations, confirm rigging or scaffold zones and perform test probes where needed.
Phased line-item proposal and submittals
Receive clear pricing split by elevation or priority, unit rates for hidden sheathing repairs, COIs and product data sheets.
Scheduled drops with resident notice
Work stack by stack during permitted weekday hours with window masking on active drops only and daily cleanup at street and yard level.
Photo-documented completion
Review date-stamped photos of opened substrates, flashing corrections and finished work before access equipment is broken down.
Questions from managing agents and co-op boards
What insurance documentation do you provide for NYC managed properties?
The Dom Construction Group LLC carries general liability, umbrella, and New York State workers' compensation insurance, and furnishes certificates of insurance before any crew sets foot on site. Where the building's contract requires it, certificates list the property owner, condominium board or cooperative corporation, and managing agent as additional insureds. We also provide product data sheets and color samples for board or architect submittal review prior to mobilization.
Can facade work be split into phases across two budget years?
Yes. Co-op and condo boards frequently address active water entry—such as wet window aprons, open parapet transitions, and failed sealant joints on weather-beaten exposures—in the first season, then schedule cosmetic EIFS recoating on remaining courtyard or street elevations the following year. Grouping work by vertical drop or elevation avoids paying twice to rig or scaffold the exact same wall section.
How are DOB permits, sidewalk sheds, and rigging handled on taller buildings?
Our crews erect our own pipe scaffold on courtyards, setbacks, and lower walls, and operate from rented or owner-furnished lifts and suspended swing stages. When street frontage, building height, or scope triggers New York City Department of Buildings permits, sidewalk bridging, or licensed rigging sign-offs, we coordinate directly with the owner's architect, engineer, expediter, and rigging or shed vendor so schedules and access drops line up cleanly.
How do you price hidden substrate damage on a lump-sum board contract?
Visible EIFS repairs, linear feet of sealant, and square footage of coating are priced as defined base-scope items. Because nobody can see every square foot of gypsum sheathing behind intact foam before opening the wall, we pair probe findings with clear unit prices per square foot for any unforeseen sheathing or framing repairs, backed by date-stamped photos of each opened section before new foam goes on.
Can you look at an EIFS building before a buyer closes on a property?
We are a repair contractor, not a licensed home inspector or building inspection engineer, so pre-purchase inspections belong with a licensed inspector or engineer hired by the buyer. Once an inspection report flags damaged EIFS panels, missing flashing, or failed caulking, or when a current owner already knows repairs are needed, we can review those items and prepare a written repair scope and budget estimate.
Share an engineer's report or facade photos
Send your property details and up to five photos, or let us know you have bid drawings to review.
Scopes we bid for managed buildings
- EIFS facade repair
Sectional cutouts, sheathing replacement, flashing corrections and high-impact ground-floor mesh.
- Window and joint sealant replacement
Full-drop recaulking around windows, PTAC sleeves, louvers and expansion joints.
- EIFS cleaning and recoating
Low-pressure washing and breathable architectural coatings across weathered elevations.
- About our company
How The Dom Construction Group LLC staffs and insures New York City EIFS projects.
Planning exterior maintenance for the coming season?
Book spring work now. Winter assessments and estimates available.